What are the rules for placing concrete in cold weather on Connecticut DOT projects?

Submit a Cold-Weather Concreting Plan for review; preheat forms/reinforcement to ≥40°F for ≥1hr; maintain concrete ≥45°F and air ≥60°F for first 6 days; extend cure to 10 days if slag/pozzolans are used; Engineer may adjust protection time based on in-place strength tests [3].

Every answer carries its source — tap a citation to read the official document.

This answer came from Verika — an expert in your pocket. Ask anything, out loud or typed; answers come from your region’s regulations and your team’s own knowledge, cited to the source. If it isn’t in the sources, Verika says so.

Verika provides information with citations to help you find and understand the rules that apply to your work. It is not a substitute for professional engineering or legal judgment. Answer generated 2026-08-28; always confirm against the cited source for your project.