What are the rules for placing concrete in cold weather on Iowa DOT projects?

Do not place concrete against surfaces below 40°F; heat mix water/aggregates to 50–80°F. Use heated housing/insulation to maintain ≥50°F for 48+ hours, monitor temps for 96 hours. If submerged ≥1 ft below water, use ≥50°F water for 96 hours, no freezing for 10 days. [1,3]