What slump is allowed for structural concrete on Massachusetts highway projects?

"[3] Corrective action for non -conforming results shall include reworking the edge, adjusting slip form paving molds to compensate for edge slump, or recalibrating the mixture. Work shall be suspended if freshly placed concrete continues to exhibit vertical edge slump , until the issue has been resolved. If the concrete has hardened and edge slumping is present, the pavement shall be repaired through patching, diamond grinding, or other acceptable means to correct the issue as directed by the Department ." [1] "[5] The maximum limit for horizontal edge slump shall be near zero. Work shall be suspended if freshly placed concrete exhibits horizontal edge slump , until the issue has been resolved ." [1] "Slump (in.) < 4 in. Target -1.0 Target +1.0" [3] "4 – 8 in. Target -1.5 Target +1.5" [3]

Every answer carries its source — tap a citation to read the official document.

This answer came from Verika — an expert in your pocket. Ask anything, out loud or typed; answers come from your region’s regulations and your team’s own knowledge, cited to the source. If it isn’t in the sources, Verika says so.

Verika provides information with citations to help you find and understand the rules that apply to your work. It is not a substitute for professional engineering or legal judgment. Answer generated 2026-08-28; always confirm against the cited source for your project.

More Massachusetts answers