What are the rules for placing concrete in cold weather on Mississippi DOT projects?

Cold weather concreting on Mississippi DOT projects requires: (1) Concrete delivery temp limits per Table 8 (e.g., 55–75°F for <12" thickness) [1]. (2) Protection for 4+ days at 50–100°F if temps <40°F post-placement [1]. (3) Heating of aggregates/water (max 100°F) or insulating blankets; no salts [1]. (4) Ice/frost removal from forms/reinforcement [1]. (5) Approved maturity meters or insulating blankets for strength verification [1]. (6) Contractor assumes all risk/costs for unsatisfactory results [2]. (7) For ground-contact concrete (e.g., footings), follow Subsection 501.03.20.3 [2].

Every answer carries its source — tap a citation to read the official document.

This answer came from Verika — an expert in your pocket. Ask anything, out loud or typed; answers come from your region’s regulations and your team’s own knowledge, cited to the source. If it isn’t in the sources, Verika says so.

Verika provides information with citations to help you find and understand the rules that apply to your work. It is not a substitute for professional engineering or legal judgment. Answer generated 2026-08-28; always confirm against the cited source for your project.

More Mississippi answers