New Hampshire · answered by Verika · verified against sources

What air content is required for concrete on New Hampshire DOT projects?

Air content for NH DOT concrete classes ranges from 3% to 9% (Class B: 3–6%, Class A: 4–7%, Class AA: 5–9%, Class AAA: 5–9%). Class F requires 15–25% air content.

Every answer carries its source — tap a citation to read the official document.

This answer came from Verika — an expert in your pocket. Ask anything, out loud or typed; answers come from your region’s regulations and your team’s own knowledge, cited to the source. If it isn’t in the sources, Verika says so.

Verika provides information with citations to help you find and understand the rules that apply to your work. It is not a substitute for professional engineering or legal judgment. Answer generated 2026-08-28; always confirm against the cited source for your project.

More New Hampshire answers