What are the curing requirements for concrete pavement in Nevada?

"Cure Portland cement c oncrete pavement by either method specified in this Subsection. In case of low temperatures, increase the curing period according to the provisions of Subsection 501.03.09 (b)." [1] "(b) Curing Compound Method . Do not apply the curing compound until all patchin g and surface finishing, except grinding, has been completed. When directed during periods of hot weather, continue fogging of the concrete with water after curing compound is applied until it is no longer required. Such fogging after the application of th e curing compound will be paid for as extra work as provided in Subsection 104.03." [1] "Keep the curing membrane in place for not less than 7 days. Immediately repair broken or damaged portions before the expiration of the curing period with new sheets properly cemented into place." [3] "Use one of the above methods on the exposed surfaces if the forms are removed within 7 days after the concrete has been placed." [3]

Every answer carries its source — tap a citation to read the official document.

This answer came from Verika — an expert in your pocket. Ask anything, out loud or typed; answers come from your region’s regulations and your team’s own knowledge, cited to the source. If it isn’t in the sources, Verika says so.

Verika provides information with citations to help you find and understand the rules that apply to your work. It is not a substitute for professional engineering or legal judgment. Answer generated 2026-08-28; always confirm against the cited source for your project.

More Nevada answers