What are the rules for placing concrete in cold weather on South Dakota DOT projects?
Between Oct 15–May 1 and when directed, maintain concrete ≥35°F until 1500 psi for sidewalks/curb/gutter/etc. For bridges/structures, maintain ≥50°F for 72h then ≥40°F for 48h (or ≥65°F for 72h). Flooding with water for 7 days is allowed. No temp drop >40°F in 24h post-protection. Enclosures must allow heat circulation; open flames prohibited unless forms cover entire surface.
Every answer carries its source — tap a citation to read the official document.
This answer came from Verika — an expert in your pocket. Ask anything, out loud or typed; answers come from your region’s regulations and your team’s own knowledge, cited to the source. If it isn’t in the sources, Verika says so.
Verika provides information with citations to help you find and understand the rules that apply to your work. It is not a substitute for professional engineering or legal judgment. Answer generated 2026-08-28; always confirm against the cited source for your project.