Utah · answered by Verika · verified against sources

What are the curing requirements for concrete pavement in Utah?

For concrete pavement in Utah, use a liquid membrane curing compound (LMCC) with ASTM C309 Type I D Class A, applied at 100 ft²/gal in two passes (combined rate) with 30 min between applications. Keep pavement moist with fogging (fine mist, no excess water) if curing compound application is delayed. Do not use fogging to aid finishing or alter water/cement ratio [7,1,5].

Every answer carries its source — tap a citation to read the official document.

This answer came from Verika — an expert in your pocket. Ask anything, out loud or typed; answers come from your region’s regulations and your team’s own knowledge, cited to the source. If it isn’t in the sources, Verika says so.

Verika provides information with citations to help you find and understand the rules that apply to your work. It is not a substitute for professional engineering or legal judgment. Answer generated 2026-08-28; always confirm against the cited source for your project.

More Utah answers