What are the curing requirements for concrete pavement in South Carolina?
Exclude vehicular traffic for ≥14 days (excluding temps <40°F; count 40–50°F at ½ time) OR cure 48 hrs until field-cured specimens reach 3000 psi (ASTM C31) [1]. Apply white pigmented curing compound immediately after finishing, uniformly at ≥0.06 gal/sq yd, protecting joints [5].