What are the rules for placing concrete in cold weather on South Carolina DOT projects?

Do not place concrete if air temp is below 35°F without RCE authorization. If placing above 35°F or with authorization, protect concrete to maintain air temp between 50°F–100°F for 96 hours post-placement. Monitor concrete temps for 4 days. Use approved measures like curing blankets (min 4 days), heating equipment, or windbreaks. Remove ice/frost from materials before placement. Alternative measures require RCE approval.

Every answer carries its source — tap a citation to read the official document.

This answer came from Verika — an expert in your pocket. Ask anything, out loud or typed; answers come from your region’s regulations and your team’s own knowledge, cited to the source. If it isn’t in the sources, Verika says so.

Verika provides information with citations to help you find and understand the rules that apply to your work. It is not a substitute for professional engineering or legal judgment. Answer generated 2026-08-28; always confirm against the cited source for your project.

More South Carolina answers